The Stage Deliverable s-Sure Scope of Work
     
System Design Inspection Inspection report, including initial recommendations for the existing breaches We need to do a quick review on the changes; this could be planned off-site based on provided information.
     
Configuration & Installation Audit Overview An operative report, including practical instructions for secure configuration & installation of the examined elements. To be planned onsite
     
Procedure Security Aspects Overview A list of recommended procedures and improvements required in the existing procedures. To be planned onsite, which will support the ISO 27001 compliancy as well
     
Internal Penetration Test A report of findings and operative recommendations Infrastructure and application test,
     
External Penetration Test A report of findings and operative recommendations To be planned off-site
     
e-Sure Certification for the system Permission to present the e-Sure seal on the site, and a link to security information of the certified site. Certification letter and certificate. Registration number. Instructions about the use of the e-Sure logo.