You are here:
Roadmap to Certification
Deliverables
| The Stage | Deliverable s-Sure | Scope of Work |
| System Design Inspection | Inspection report, including initial recommendations for the existing breaches | We need to do a quick review on the changes; this could be planned off-site based on provided information. |
| Configuration & Installation Audit Overview | An operative report, including practical instructions for secure configuration & installation of the examined elements. | To be planned onsite |
| Procedure Security Aspects Overview | A list of recommended procedures and improvements required in the existing procedures. | To be planned onsite, which will support the ISO 27001 compliancy as well |
| Internal Penetration Test | A report of findings and operative recommendations | Infrastructure and application test, |
| External Penetration Test | A report of findings and operative recommendations | To be planned off-site |
| e-Sure Certification for the system | Permission to present the e-Sure seal on the site, and a link to security information of the certified site. Certification letter and certificate. Registration number. Instructions about the use of the e-Sure logo. |